Plutonic Services

Industries · Construction

The site poured. The drawing is still last week's.

Plutonic builds construction software for Indian contractors — site progress, drawings, materials, and snags tied to the project you are running this month.

  • Your PM learns about a slip from the client, not from yesterday's site report
  • The gang is working off a drawing that was superseded on Tuesday
  • Cement is 'on the way' in WhatsApp while the store receipt says something else
  • Snags are photos in a group with no owner and no close date

Overview

What a contractor actually needs from software

A construction firm does not need another Gantt in the cloud. You need the superintendent, the drawing, and the PO to agree before the pour. Plutonic builds that layer for phones on site — then adds structure where WhatsApp is currently the register, not where it looks clever.
Construction industry — What a contractor actually needs from software
Construction

Challenges

If this is your week, keep reading

If two of these are already true, you don't need another workshop. You need the first workflow live.
01

Progress is a story at 6pm

Leadership hears about delay after the schedule is already broken.

  • Daily report is a WhatsApp paragraph
  • Photos are not against the activity
  • Blockers show up in the monthly review
02

The drawing on site is the wrong one

Teams pour and fix from stale PDFs and RFIs that never closed.

  • Superseded set still on the WhatsApp
  • RFI answer lives in someone's inbox
  • Rework because the version fight happened after the pour
03

The PO and the site do not match

Procurement status and gate receipts never reconcile with what the gang used.

  • Emergency buy because nobody trusted the store
  • Vendor invoice vs site receipt is a weekend job
  • Material on another tower while this one waits
04

Snags die in the group chat

Punch items and safety observations are photographed and never become a task.

  • No owner, no due date
  • Close-out is a thumbs-up emoji
  • Handover punch list is a surprise

Solutions

What we put on site and in the project office

The mess in one line. What we put in underneath.

Solution 01

A daily that is against the plan

The mess

Progress updates arrive too late to change the week.

What we put in

Site reporting with progress, blockers, and photos against the activity — on a phone the supervisor will fill before leaving site.

  • Photo on the activity, not a dump album
  • Blocker with an owner the same day
  • PM sees the slip before the client does

Solution 02

The current set, only the current set

The mess

Sites work from stale drawings and open RFIs.

What we put in

Document and RFI workflows with version identity, approvals, and field access to the live set.

  • Superseded stamp that the site cannot miss
  • RFI answer in the record, not email
  • Phone access without downloading last month's ZIP

Solution 03

PO, gate, and consumption in one trail

The mess

Materials status and receipts do not match site need.

What we put in

Procurement and receipt workflows that connect POs, deliveries, and what the site actually used.

  • Gate receipt against the PO
  • Store the supervisor can check
  • Fewer emergency buys and fewer invoice fights

Solution 04

A snag with a name on it

The mess

Punch and safety items disappear into chat.

What we put in

Issue tracking with owner, due date, and photo proof — from punch lists to safety observations.

  • Open item on a person, not a group
  • Close with a photo, not an emoji
  • Handover list you can defend

Capabilities

What we actually build for construction firms

What we actually build here — not a menu copied onto every industry page.

01

Project views leadership will open

Schedule risk, cost signals, and open blockers — a list, not a 40-slide pack.

  • Slip this week
  • Open RFIs
  • Material that is late

02

Site progress on a phone

Daily reporting, photos, and manpower a supervisor can finish before the van leaves.

  • Against the activity
  • Works offline enough to survive the basement
  • Handover the next day can open

03

Drawings, submittals, RFIs

Versioned sets and approvals with a trail that survives a dispute.

  • Current set only on site
  • RFI with an owner
  • Approval in the record

04

Procurement & site store

POs, deliveries, and stock that cut emergency buys.

  • Receipt at the gate
  • Store vs indent
  • Vendor status without a call

05

Punch & snag workflows

Owned tasks from inspection to close-out with photo proof.

  • Owner and due date
  • Photo on close
  • List for handover

06

Safety observations that close

Capture, escalate, and verify the fix — not a photo in the safety group.

  • Observation with a location
  • Corrective action owned
  • Verify before you tick it

07

Vendor portals

Schedules, drawings, and invoices without an email storm.

  • What they need, only that
  • Invoice against the PO
  • Less 'please find attached'

08

ERP & accounts hooked in

Project ops that can reconcile with finance — not a parallel universe.

  • No double entry as the plan
  • PO and bill in one trail
  • Pilot one project first

Use cases

Jobs a contractor will pay for

See the delay this week, not in the MIS

Blockers daily, on the activity, before the client meeting.

  • One project first
  • Photo against the plan
  • PM phone, not a weekend Excel

Stop pouring from the wrong PDF

Current drawings and RFI status impossible to miss on site.

  • Supersede that sticks
  • RFI in the record
  • Less rework from version fights

Match PO, gate, and use

Cut waste and vendor disputes with a trail the QS can use.

  • Receipt against PO
  • Store the site trusts
  • Fewer emergency indents

Close snags before handover theatre

Punch items as owned tasks with evidence.

  • Owner on the item
  • Photo on close
  • List you can hand the client

Recommended services

Where to start in our practice

Jump into the service pages most relevant to this vertical.

Why it matters

Why construction teams stay with us

We talk pours and RFIs, not 'smart site'

If we cannot name the superintendent, the drawing, and the snag, we do not belong in the kickoff.

  • Delay risk
  • Rework
  • No buzzword kickoff

Tools a supervisor will fill at 5:30

Time pressure and dust — not only a PMO office.

  • Phone-first
  • Few taps
  • Works when the basement has no signal

Paper that survives a dispute

Version and approval trails you can pull when the client or the vendor argues.

  • Current set identity
  • RFI trail
  • Snag evidence

One project, then the company

Pilot a package or a site before you force a new habit everywhere.

  • Rollback if the site rejects it
  • Baseline on that project
  • Expand when the daily is real

FAQ

Construction questions

Straight answers before the call.

Yes — controlled portals and mobile workflows scoped to the drawings, snags, and bills they need. Not the whole company drive.

Bring one project's blockers onto a phone

Book a call to pick site reporting, drawings, or procurement — one site, live.

Book Strategy Call
Book Strategy Call